-
From OpenGov Weekly Market and Economics Roundup for the week ended 15 December 2017
This Roundup covers critical economic data and publications used by NSW Treasury for monitoring and analysis. -
From OpenGov Weekly Economic Calendar - for the week commencing 18 December 2017
Weekly Economic Calendar shows future release dates of key economic data and publications used by NSW Treasury for monitoring and analysis. -
From OpenGov Market failure guide
A guide to categorising market failures for government policy development and evaluation -
From OpenGov Police Integrity Commission Annual Report 2016-17
Police Integrity Commission Annual Report 2016-17 -
From OpenGov M5 Casula link: environmental impact statement: clause 59 certificate
The proposal recommended for acceptance in this report is the construction of a motorway between Moorebank Road, Moorebank and Campbelltown Road at Prestons linking the existing... -
From OpenGov Proposed duplication of the Brunswick Heads Bypass and upgrade of the Pacific Highway Brunswick River to Yelgun: environmental impact statement: July 1998
Construction and operation of a high standard second carriageway for the Brunswick Heads Bypass between the intersection at Saddle Road and the Brunswick River; from the... -
From OpenGov Faunal studies for the proposed Mount White - Kariong - Ourimbah sections of the Sydney - Newcastle Freeway (no. 3) - Part 1
The Department of Main Roads of New South Wales has proposed two alternative corridors for the Sydney-Newcastle Freeway (Freeway No. 3) between Mount White and Somersby (Map... -
From OpenGov North West Transport Link: environmental impact assessment report: prepared pursuant to clause 64 of the Environmental Planning and Assessment Regulation 1980
This report concerns the proposal for a north west transport link in a corridor between Old Windsor Road at West Baulkham Hills and Epping Road at North Ryde. It describes the... -
From OpenGov Proposed upgrade of the Pacific Highway at Karuah: environmental impact statement
Construction and operation of a high standard dual carriageway from Swan Bay Road along a new route via Horse Island to rejoin the Pacific Highway east of The Branch Lane. The... -
From OpenGov Proposed upgrade of the Pacific Highway at Karuah: species impact statement
The Roads & Traffic Authority (RTA) is proposing to upgrade the Pacific Highway at Karuah 1, on the mid-north coast of NSW (Figure 1.1). After a detailed route selection... -
From OpenGov Proposed upgrade of the Pacific Highway at Karuah: environmental impact statement: working papers: volume 2
As part of the ten year Pacific Highway Upgrade Program, the RTA has commissioned Ove Arup and Partners to undertake the route selection studies, concept design and preparation... -
From OpenGov Princes Highway replacement of Trunketabella Creek Bridge: environmental impact statement and review of environmental factors
In 1998, the NSW Government initiated a 5 Year Country Timber Bridge Program which involves the replacement or refurbishment of all existing timber bridges across NSW in order... -
From OpenGov Elizabeth Drive: environmental impact statement: upgrade of Elizabeth Drive from east of Mamre Road to Luddenham Road: volume 2: appendices: working paper no. 4: traffic and transport assessment
In the preparation of the Environmental Impact Statement for the Upgrade of Elizabeth Drive and the Overview Report on the Western Sydney Orbital, a number of traffic and... -
From OpenGov Sydney Olympic Park Authority Annual Report 2016-17
Annual Report covering the activities of the Sydney Olympic Park Authority during the 2016-17 Financial Year. -
From OpenGov Reconstruction of the Castlereagh Highway environmental overview
This environmental overview has been prepared to identify environmental constraints or potential issues that may require additional investigation, specialist studies, design... -
From OpenGov Tarcutta truck changeover facility: environmental, social and economic study
Tarcutta, a small rural village, is one of the last remaining towns through which the Hume Highway passes. It is strategically positioned approximately halfway between Melbourne... -
From OpenGov Sydney Catchment (SCA) Upper Canal bridge maintenance works: review of environmental factors
The Sydney Catchment (SCA) proposes to carry out maintenance works on SCA Upper Canal bridges. The Canal gravity feeds water from the upper Nepean System dams to Prospect... -
From OpenGov South Western (F5) freeway: Alexandria to Beverly Hills: environmental impact statement
Prior to the preparation of the Environmental Impact Statement, the Roads and Traffic Authority undertook an extensive public consultation programme to ascertain the views of... -
From OpenGov Upgrade of Elizabeth Drive from east of Mamre Road to Luddenham Road Badgerys Creek: Director-General's Report, Section 115C of the Environmental Planning and Assessment Act, April 1996
The proposal is to upgrade a 9.4 km section of Elizabeth Drive from about 400 metres east of Mamre Road to Luddenham Road, located some 10 km north west of the Liverpool CBD... -
From OpenGov New bridge and approaches at the Woronora River, Woronora: supplementary review of environmental factors
This Review of Environmental Factors (REF) has been prepared as a supplementary environmental assessment to the Environmental Impact Statement (EIS) prepared in 1990 for the...