-
Central Coast CouncilData provider: Flood Data Portal
The Floodplain Management Plan divides the Cockrone Lagoon area into six precincts: Cockrone Lagoon - Beach Berm High Hazard Floodway/Investigation Cockrone Lagoon - Entrance...
-
Central Coast CouncilData provider: Flood Data Portal
Wamberal Lagoon is a small coastal lagoon within the Gosford City and Wyong Council Local Government areas (Figure 1). The lagoon has a surface area of approximately 0.5 square...
-
Central Coast CouncilData provider: Flood Data Portal
Storage Volumes: The modelling showed that the approach developed for Terrigal and Wamberal Lagoons could be satisfactorily applied to Avoca Lagoon for the opening of 14...
-
Central Coast CouncilData provider: Flood Data Portal
Separate Flood studies have been undertaken for four coastal lagoons in the Gosford area, that is, Avoca, Cockrone, Terrigal and Wamberal Lagoons. Different analytical...
-
Central Coast CouncilData provider: Flood Data Portal
-
Central Coast CouncilData provider: Flood Data Portal
The Ourimbah Creek Floodplain Risk Management Plan has been prepared for the Central Coast Council in accordance with the NSW Government’s Floodplain Development Manual 2005...
-
Central Coast CouncilData provider: Flood Data Portal
The primary objective of the flood study is to provide Council with design flood levels for Tuggerah Lakes. A second objective, to provide a flood forecasting capability, is...
-
Central Coast CouncilData provider: Flood Data Portal
The Green Point Creek system has been divided into component areas for application of a floodplain management plan. The component areas, illustrated on Figure 13, cover:...
-
Central Coast CouncilData provider: Flood Data Portal
Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the...
-
Central Coast CouncilData provider: Flood Data Portal