FLOODPLAIN RISK MANAGEMENT STUDY
The specific aims of this study are to:
- review the results from the Flood Study,
- identify development and planning controls to regulate redevelopment in the flood
affected properties and to ensure that future redevelopment does not significantly
add to the overall potential damages,
- make recommendations to adopt Flood Planning Levels (FPL) appropriate for the
catchment,
- investigate available floodplain risk management measures along with
prioritisation, staging of works and preliminary costings.
The subsequent Floodplain Risk Management Plan will document the recommended strategies.
FLOODPLAIN RISK MANAGEMENT MEASURES
A list of all possible floodplain risk management measures which could be applied in the study
area were initially developed for consideration. The assessment extended to examination of
potential future development and its possible adverse impacts on flows and water quality. The
Green Square – West Kensington Floodplain Risk Management Study
measures were then assessed in terms of their suitability and effectiveness for reducing social,
ecological, environmental, cultural and economic impacts. As part of this process a number of
measures were identified as not being worthy of further consideration.
A summary of the various floodplain management measures considered during the course of the
study is presented in Table (i) together with a brief assessment of their viability for
implementation as part of the Floodplain Risk Management Plan for the Green Square – West
Kensington catchment.
RANDWICK CITY COUNCIL FINALISATION - October 13, 2011
It is necessary to note that the City Of Sydney is currently investigating floodplain
management measures for the Green Square Town Centre. This location is significantly
downstream from the Randwick City Council local government area and any resulting
amendments will not have any impacts on the Randwick City Council portion of the
catchment.
As such, this study is now finalised as it relates to the Randwick City Council local
government area. Details for the City of Sydney local government area are still in draft
form and should not be relied upon until finalised.