-
From Flood Data Portal Final Port Stephens Foreshore (Floodplain) Risk Management Study and Plan...
Data contains: * Main report * Appendices -
From Flood Data Portal Gloucester Floodplain Risk Management Study and Plan - Reports
Data contains * Main Report * Mapping * Options Impacts -
From Flood Data Portal Kyogle Flood Model Results
Kyogle Model Results from 2004 Flood Study and 2009 Flood Risk Management Study and Plan -
From Flood Data Portal Tallowa Dam DSEP Inundation Data - 2019 Dam Break Assessment
Tallowa Dam DSEP Inundation Maps SDF and PMF Event Geospatial Data - 2019 Dam Break Assessment -
From Flood Data Portal Eden, Twofold Bay, Towamba River Flood Study - FPL
Flood Planning Level grids -
From Flood Data Portal Brisbane Water Foreshore Floodplain Risk Management Plan - Report Appendices
A B C D -
From Flood Data Portal Edward River at Deniliquin Floodplain Risk Management and Plan - Report
Complete report -
-
-
From Flood Data Portal Grafton and Lower Clarence Floodplain Risk Management Plan: Review of...
TUFLOW -
From Flood Data Portal Grafton and Lower Clarence Floodplain Risk Management Plan: Review of...
TUFLOW -
From Flood Data Portal Sussex Inlet - Flood Map
Hazard and hydraulic categories; extents and categorisations based on the Flood Planning Level (1% AEP flood + 500mm freeboard). -
From Flood Data Portal Lapstone, South Glenbrook and South Blaxland Floodplain Risk Management...
Existing and mitigation -
-
From SEED Bongil Bongil NP Rapid Data Points
Rapid floristic survey sites for validation and accuracy assessment of Bongil Bongil NP vegetation mapping (2011). -
From Transport Bus Lanes
Bus lanes are sign-posted or marked as bus lanes. They are provided primarily for buses, but can also be used by: * Taxis * Hire cars (but not rental cars) * Motorcycles and... -
From OpenGov The costs and benefits of interventions in the area of mental health: a rapid review
To inform the development of the draft strategic plan for mental health in NSW, a rapid review was commissioned to examine the evidence on the costs and benefits of... -
From OpenGov Proposed widening of the Princes Highway between Mogo and Moruya, Stage 3:...
Stage 3 of the proposed widening of the Princes Highway is for a length of approximately 3.3km between Mogo and Moruya. Major environmental impacts include loss of habitat... -
From OpenGov Proposed upgrade of the Pacific Highway at Karuah: environmental impact...
Arup Transportation Planning was commissioned to carry out a traffic assessment for the proposed upgrade of the Pacific Highway at Karuah, based on the adopted 'Horse Island'... -
From OpenGov State Level Emergency Risk Assessment Executive Summary
This report presents the results of a state level emergency risk assessment – a collaborative effort across the emergency management sector over the period August 2016 to...