-
From Flood Data Portal Lower Bellinger and Kalang Floodplain Risk Management Study and Plan - Reports
The Lower Bellinger and Kalang Floodplain Risk Management Study Report is in 5 parts (Main Report, Appendices A-D_ The Lower Bellinger and Kalang Floodplain Risk Management Plan... -
From Flood Data Portal SES Data Portal Contents
Description of all data uploaded to SES Data Portal including an overview and full list of files. -
From Flood Data Portal Wooli Floodplain Risk Management Study and Plan as adopted
Document as adopted by Council resolution 07.23.180 (draft watermark has not been removed) -
From Flood Data Portal 1_FCT FRMS&P - Final Reports and Mapping
PDF Copies of Volume 1 FRMS&P Report, Volume 2 Flood Study Update, and Volume 3 Flood Mapping Compendium. -
From Flood Data Portal MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020
The Murrumburrah Flood Study (Reference 1), the first stage of the management process was completed in December 2019. The Murrumburrah Floodplain Risk Management Study and Plan... -
From Flood Data Portal GIS data MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020
GIS data associated with the MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020 -
From Flood Data Portal Orange Ultimate Flood Modification Scheme Phase A
Phase A comprised an update of the existing DRAINS and TUFLOW flood modelling (developed as part of the Blackmans Swamp Creek and Ploughmans Creek Floodplain Risk Management... -
From Flood Data Portal Ultimate Flood Modification Scheme Vegetation Management Plan
KBR in partnership with Premise were commissioned by Orange City Council (Council) to undertake Phases A and C of the Orange Ultimate Flood Modification Scheme (UFMS)... -
From Flood Data Portal The Orange UFMS: Feasibility & Design Project – East Orange Harvesting...
The Orange UFMS: Feasibility & Design Project – East Orange Harvesting Wetland Flood Modelling -
From Flood Data Portal Orange UFMS: November 2022 Model Validation
The Orange Ultimate Flood Modification Scheme: TUFLOW Model Validation Using November 2022 Historical Event -
-
From Flood Data Portal Barellan Levee Construction Plans
Construction Plans for the Barellan Levee based in Option D in the Barellan Levee Options Feasibility Study (WMS February 2021) -
-
From Flood Data Portal All other modelling data
All other modelling data, hydraulic and hydrologic model inputs and outputs. -
From Flood Data Portal Bonalbo Floodplain Risk Management Plan
The Bonalbo Floodplain Risk Management Plan (FRMP) has been prepared for Kyogle Council in accordance with the NSW Flood Prone Land Policy and the principles of the Floodplain... -
From Flood Data Portal Bonalbo Flood Study Adopted Report
Final Adopted Report by Council for the Bonalbo Flood Study -
From Flood Data Portal Hawkesbury Nepean - Hydraulic Model - Report
Complete Report -
From Flood Data Portal Cranebrook Overland Flow Flood Study prep-processed results
Pre-processed results from the hydraulic model Tuflow -
From Flood Data Portal Post processed results in GIS format
Post processed results including levels, depths, velocities, hazard, flood function, flood emergency response classification, flood planning area, pipe capacity assessment,... -
From Flood Data Portal Cranebrook Overland Flow Flood Study Hydrology and Hydraulic Models
This folder contains the hydrologic and hydraulic models inputs files developed for the Cranebrook Overland Flow Flood Study