Proposed upgrade of the Pacific Highway at Karuah: environmental impact statement

Construction and operation of a high standard dual carriageway from Swan Bay Road along a new route via Horse Island to rejoin the Pacific Highway east of The Branch Lane. The proposal includes junctions at Swan Bay Road and The Branch Lane. It also includes a 615 m bridge across the Karuah River and a 200 m bridge across SEPP 14 Wetland 743 west of Horse Island. The existing Pacific Highway would be retained as a local road, with some modifications. Access via other local roads would be retained and some modifications are required. The proposal includes the definition of a corridor of sufficient width to accommodate a dual carriageway road, and environmental mitigation measures.

Data and Resources

Tags

Additional Info

Field Value
Title Proposed upgrade of the Pacific Highway at Karuah: environmental impact statement
Type
Language
Licence lsba
Data Status
Update Frequency
Landing Page https://data.nsw.gov.au/data/dataset/216b3cf7-869a-4707-a96a-2af0e7641d73
Date Published 2021-09-08
Date Updated 2021-09-08
Contact Point
Temporal Coverage -
Geospatial Coverage
Jurisdiction
Data Portal Data.NSW
Publisher/Agency NSW Government