Haslams Creek Floodplain Risk Management Study & Plan

AIMS OF THE CURRENT STUDY

In broad terms, the current Floodplain Risk Management Study has investigated what can be done to minimise the effects of flooding in the Haslams Creek catchment and recommended a strategy in the form of a draft Floodplain Risk Management Plan.

Specific objectives of the study include:

  • a review of the results from the 1999 Flood Study;
  • consideration of the potential for culvert blockages and associated flood impacts;
  • the implementation of a community consultation strategy, to ensure community input is obtained at key times throughout the study;
  • a description and quantification of the flood problems in the Haslams Creek catchment including the likely cost of flooding to the local community;
  • the identification and assessment of potential floodplain risk management measures to reduce the risks and hazards of flooding;
  • a detailed review of issues relating to planning and development controls within the floodplain. Don Fox Planning Pty Ltd has prepared a document entitled Report on Planning Issues as part of this study. It is reproduced in Appendix A. Included in this report, is a proposed draft Development Control Plan (DCP) entitled “Managing Our Flood Risks”;
  • the development of a recommended draft Floodplain Risk Management Plan for the Haslams Creek catchment that outlines the best measures to reduce flood damage, based on environmental, social, economic, financial and engineering considerations.

Data and Resources

Tags

Additional Info

Field Value
Unpublished false
Spatial { "type": "Polygon", "coordinates": [ [ [ 151.07574462890625, -33.83471631722714 ], [ 151.06879663362633, -33.83009913470014 ], [ 151.05620784277562, -33.830234595494936 ], [ 151.046792215202, -33.834091056175865 ], [ 151.04646261781454, -33.84441115971999 ], [ 151.04221228044477, -33.849027595192894 ], [ 151.03632774436846, -33.85473005173602 ], [ 151.03207740699872, -33.854188327768426 ], [ 151.0252109519206, -33.85663174887107 ], [ 151.00886192405596, -33.864506038708654 ], [ 151.01965255569667, -33.87916645922085 ], [ 151.0281532094814, -33.88296586961811 ], [ 151.03534926194698, -33.882150680708804 ], [ 151.0481002740562, -33.87617928016506 ], [ 151.0516948532313, -33.869392150982435 ], [ 151.06085128616542, -33.863690673469094 ], [ 151.06706541962922, -33.853372898814285 ], [ 151.07262381585315, -33.848756732959046 ], [ 151.07458419632167, -33.843869405121666 ], [ 151.07785605126992, -33.84115187825641 ], [ 151.07574462890625, -33.83471631722714 ] ] ] }
Geospatial Coverage New South Wales (NSW81093)
Temporal Coverage From
Temporal Coverage To 2003-01-01 00:00:00
Idioma
Type
Data Status Inactive
Update Frequency as_required
Display User Contact Details No
Publisher Cumberland Council
Contact Email council@cumberland.nsw.gov.au
Jurisdiction New South Wales Government
Metadata.NSW