{"help": "https://data.nsw.gov.au/data/en/api/3/action/help_show?name=package_show", "success": true, "result": {"author": "Albury City Council", "author_email": null, "contact_info": "False", "contact_point": "info@alburycity.nsw.gov.au", "creator_user_id": "8d2ac61a-d63a-4456-a00d-b35fee4c4025", "data_state": "inactive", "id": "26c9a0c3-41e0-44ca-9001-4a6885c2cae4", "isopen": true, "jurisdiction": "New South Wales Government", "license_id": "cc-by", "license_title": "Creative Commons Attribution", "license_url": "http://www.opendefinition.org/licenses/cc-by", "maintainer": null, "maintainer_email": null, "metadata_created": "2024-07-05T05:58:29.826304", "metadata_modified": "2025-12-17T05:08:33.678260", "name": "fdp-south-albury-levee-upgrade-murray-river-flood-study-spatial-layers", "notes": "Processed flood modelling outputs - including flood extents, flood planning area and hydraulic categorisation (i.e. floodway, flood storage, flood fringe)", "num_resources": 1, "num_tags": 3, "organization": {"id": "cf38cf6d-4e29-48f5-b23f-83c428d8bd77", "name": "albury-city-council", "title": "Albury City Council", "type": "organization", "description": "The City of Albury, located in Wiradjuri country, sits at the centre of the Sydney-Melbourne-Adelaide triangle on the Murray River.\r\n\r\nAlbury's location on the banks of the Murray River and within its catchment areas means the city is vulnerable to flooding - anything from overflowing drains to inundation. \r\n\r\nAlburyCity is responsible for local land use planning within its Local Government Area including land on the floodplains of the drainage catchments and the Murray River. The NSW State Government\u2019s Flood Prone Land Policy provides a framework to ensure sustainable use of floodplain environments. Under the Policy, the management of flood liable land remains the responsibility of local government.\r\n\r\nThe NSW Government\u2019s \u201cFloodplain Development Manual: the management of flood liable land\u201d, April 2005 provides guidance to support the policy. The Manual details the actions required to assist Council\u2019s in meeting their obligations under the policy, which is to plan and manage flood prone land in accordance with its flood exposure. The undertaking of flood studies and the development of flood risk management plans for these areas is an important part of this process.\r\n", "image_url": "2021-03-19-054045.527611Albury.JPG", "created": "2021-03-11T10:11:58.787710", "is_organization": true, "approval_status": "approved", "state": "active"}, "owner_org": "cf38cf6d-4e29-48f5-b23f-83c428d8bd77", "private": false, "spatial": "{\r\n \"type\": \"Polygon\",\r\n \"coordinates\": [\r\n  [\r\n   [\r\n    147.01879911916458,\r\n    -36.13307650374357\r\n   ],\r\n   [\r\n    146.9576691671678,\r\n    -36.126420977880905\r\n   ],\r\n   [\r\n    146.91164998982197,\r\n    -36.138067777756255\r\n   ],\r\n   [\r\n    146.87043878622862,\r\n    -36.109779694255494\r\n   ],\r\n   [\r\n    146.8724993464083,\r\n    -36.08314630545674\r\n   ],\r\n   [\r\n    146.89379180159816,\r\n    -36.06427552759358\r\n   ],\r\n   [\r\n    146.94255839251693,\r\n    -36.067605993869655\r\n   ],\r\n   [\r\n    146.9940723970086,\r\n    -36.07315645766907\r\n   ],\r\n   [\r\n    147.02704135988327,\r\n    -36.08925058764666\r\n   ],\r\n   [\r\n    147.04558640150026,\r\n    -36.09923839056264\r\n   ],\r\n   [\r\n    147.01879911916458,\r\n    -36.13307650374357\r\n   ]\r\n  ]\r\n ]\r\n}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_to": "2024-06-24", "title": "South Albury Levee Upgrade - Murray River Flood Study Spatial Layers", "type": "dataset", "unpublished": "false", "update_freq": "as_required", "url": null, "version": null, "extras": [{"key": "fdp_type", "value": "related-dataset"}, {"key": "harvest_portal", "value": "Flood Data Portal"}, {"key": "harvest_url", "value": "https://flooddata.ses.nsw.gov.au/related-dataset/south-albury-levee-upgrade-murray-river-flood-study-spatial-layers"}], "groups": [{"description": "The function of [emergency management](http://search.records.nsw.gov.au/functions/14) comprises activities aimed at minimising and managing disasters and assisting individuals, groups and whole communities in times of crisis. \r\n\r\nThe function includes developing plans for the defence of the community in times of national crisis, assisting in the control of fires, floods, storms, earthquakes and other natural phenomena, rescuing the injured and ferrying the sick and injured to hospital.", "display_name": "Emergency Management", "id": "05c69a72-0e7e-48b1-a79c-f12f5d582079", "image_display_url": "", "name": "emergency-management", "title": "Emergency Management"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2025-12-17T05:08:33.703020", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "", "hash": "", "id": "30eb0cb2-4cb0-49ef-ab36-5d3a10bf26d4", "last_modified": null, "metadata_modified": "2025-12-17T05:08:33.684775", "mimetype": null, "mimetype_inner": null, "name": "South Albury Levee Upgrade - Murray River Flood Study spatial layers", "package_id": "26c9a0c3-41e0-44ca-9001-4a6885c2cae4", "position": 0, "resource_type": null, "size": null, "state": "active", "tracking_summary": {"total": 0, "recent": 0}, "url": "https://flooddata.ses.nsw.gov.au/dataset/4929547d-ad67-42a4-8427-3f2eff036654/resource/a3de6230-d217-4907-b864-9c588763982d", "url_type": null}], "tags": [{"display_name": "albury", "id": "00e993b9-66b9-4281-8a09-117bc849d205", "name": "albury", "state": "active", "vocabulary_id": null}, {"display_name": "flood study", "id": "3f1c9e98-e718-4b0c-a66e-899c2bb8eb9d", "name": "flood study", "state": "active", "vocabulary_id": null}, {"display_name": "levee", "id": "7bd896fc-e6d9-43da-86ca-1060acc97de9", "name": "levee", "state": "active", "vocabulary_id": null}], "relationships_as_subject": [], "relationships_as_object": [], "likes": 0, "tracking_summary": {"total": 0, "recent": 0}}}