-
From Flood Data Portal Bourke Floodplain Risk Management Study and Plan - Reports
Bourke Floodplain Risk Management Study and Plan Final Report -
From Flood Data Portal Yass Floodplain Risk Management Study and Plan - Reports
Yass Floodplain Risk Management Study & Plan – Final Reports -
From SEED Coal mining and exploration within national parks, nature reserves and state...
This submission by NSW Combined Proprietors' Association details the NSW coal mining industry position on mining coal reserves located in national parks and nature reserves. -
From OpenGov Planning for school infrastructure
The Department of Education proposes to fundamentally reform school infrastructure planning and delivery to meet the future demand for student places, and to overcome chronic... -
From OpenGov Planning and evaluating pallative care services in NSW
NSW Health’s approach to planning and evaluating palliative care is not effectively coordinated. There is no overall policy framework for palliative and end-of-life care, nor is... -
From Flood Data Portal Review of the Narrandera Floodplain Risk Management Study and Plan -...
Drains Hydrological Model Input and Output Files. -
From Flood Data Portal West Coonamble Floodplain Risk Management Study and Plan - Report
Final Report -
From SEED Vegetation Map from Willson, A. Fire Management Plan - Tarawi Nature Reserve...
A Fire Management Plan was developed for Tarawi NR, involving the mapping of the reserve's vegetation, fire history and significant species. Also developed were mallee fire... -
From SEED Shire of Great Lakes report : proposed mining of high dunes adjoining the...
Environmental Impact Statement: Shire of Great Lakes report : proposed mining of high dunes adjoining the Myall-Smith Lakes / appeal by Mineral Deposits Limited under section... -
From Flood Data Portal Careel Creek Floodplain Risk Management Plan - Spatial Flood Layers (Post-Processed)
Flood Extents; Hazard Categorisation; Hydraulic Categorisation. -
From Flood Data Portal Mudgee Local Creeks Floodplain Risk Management Study and Plan Volume 2 Flood...
This report comprises Volume 2 of the Floodplain Risk Management Study and Plan (FRMP), which is being prepared on behalf of Mid-Western Council in the area drained by the... -
From Flood Data Portal Flat Rock Creek Floodplain Risk Management Study and Plan - Report
Study and plan report pdf -
From Flood Data Portal Lake Macquarie - Floodplain Management Plan August 2001
Floodplain Management Plan Report and figures. This Plan provides the basis for the future management of flood liable lands adjacent to the lake in the Lake Macquarie City... -
From City of Sydney Moving around the city
Every day 1.3 million people live, work, study, do business, shop and go out in our local area. All of these people have an interest in the future of Sydney and can have their... -
-
From Flood Data Portal Adelong Flood Study - Flood Planning Area
Interim. Includes blockage. -
From SEED The Australian Walkabout Park : bushland sanctuary and ecotourism centre :...
v 1. Planning/Design report and review of environmental effects -- v 2. Flora and fauna survey. -
From SEED Stockton Bight environmental study /
Pt. A, Introduction and executive summary -- pt. B, Resource inventory -- pt. C, Management options and strategies -- pt. D, Figures. This Environmental Study and Management... -
From OpenGov Hume Highway duplication : Sturt Highway to Mullengandra : concept plan :...
The Roads and Traffic Authority of NSW (RTA) is planning to upgrade five sections of the existing single carriageway on the Hume Highway to four lane dual carriageways (two... -
From OpenGov Wagga Wagga transport plan
No notes provided