-
From ePlanning Environmental Planning Instrument - Land Application (LAP)
This spatial dataset identifies the boundaries of land to which a NSW Standard Instrument Local Environmental Plan applies including areas which may be excluded or deferred as... -
From ePlanning Environmental Planning Instrument - Additional Permitted Uses
This spatial dataset identifies lands with additional permitted uses designated beyond those already allowed under a given land use zone as designated by the relevant NSW... -
From ePlanning Environmental Planning Instrument - Landslide Risk
This spatial dataset identifies land where development implications exist due to the Landslide Risk for certain areas as designated by the relevant NSW environmental planning... -
From ePlanning Environmental Planning Instrument - Key Sites
This spatial dataset identifies land allocated as Key Sites requiring future development to meet standards of design excellence as designated by the relevant NSW environmental... -
From ePlanning Environmental Planning Instrument - Land Reclassification
This spatial dataset identifies public land classified or reclassified as either 'operational land' or 'community land' as designated by the relevant NSW environmental planning... -
From OpenGov NSW Climate Change Fund 2015-2016
The Climate Change Fund (CCF) was established in 2007 under the Energy and Utilities Administration Act 1987. Activities under the Fund are reported for its ninth financial year... -
Biodiversity
This indicator estimates the ecological carrying capacity (habitat condition and additional effects related to habitat loss and fragmentation); and the percentage of original... -
From ePlanning Repealed - State Environmental Planning Policy (Koala Habitat Protection) 2019
This is a repealed State Environmental Planning Policy and has been superseded by the State Environmental Planning Policy (Koala Habitat Protection) 2020. This dataset contains... -
From ePlanning Biodiversity Offset Payment Calculator
The Biodiversity Offsets Payment Calculator (BOPC) was replaced by the BCF Charge System on 17 October 2022. The new BCF Charge System will now be used to determine the amount a... -
From ePlanning Environmental Planning Instrument - Obstacle Limitation Surface
This spatial dataset identifies land where development implications exist due to the Obstacle Limitations Surface for certain airports, as designated by the relevant NSW... -
From ePlanning Environmental Planning Instrument - Mineral and Extractive Resources
This spatial dataset identifies land where development implications exist due to presence of mineral and extractive resources, as designated by the relevant NSW environmental... -
From OpenGov Proposed rehabilitation of the Mid-Western Highway 53.15km to 56.38km west...
This REF has been prepared to assess the potential impacts of the proposed rehabilitation of the Mid-Western Highway between 53.18 to 56.38 km west of Bathurst, at Carcoar. It... -
From SEED LWU Regulatory Approvals
Works that need approval under section 60 of the local government act or section 292 (1) (a) of the Water Management Act. Under section 60 of the Local Government Act and... -
From SEED Inundation Maps for NSW Inland Floodplain Wetlands
Under the NSW DPIE-EES Environmental Water Management Program the distribution and extent of inundation is monitored in large inland floodplain wetland assets which are targeted... -
From SEED Murray-Darling Basin floodplain vegetation mapping, Darling - VIS_ID 4454
The Murray-Darling Basin Plan (available at http://www.comlaw.gov.au/Details/F2012L02240) was developed under the Commonwealth Water Act 2007 and aims to deliver a coordinated... -
Water quality indicators
Proportion of monitoring sites in NSW with a Water Quality Index Rating of good, moderate and poor. The Water Quality Index measures the water quality condition of rivers in... -
From ePlanning Environmental Planning Instrument - Minimum Lot Size (LSZ)
This spatial dataset identifies the minimum lot size that is permitted on land as designated by the relevant NSW environmental planning instrument (EPI) under the Environmental... -
From ePlanning Environmental Planning Instrument - Floor Space Ratio
This spatial dataset identifies the maximum floor space ratio that is permitted on land as designated by the relevant NSW environmental planning instrument (EPI) under the... -
From ePlanning Environmental Planning Instrument - Height of Buildings (HOB)
This spatial dataset identifies the maximum height of a building that is permitted on land as designated by the relevant NSW environmental planning instrument (EPI) under the... -
From ePlanning SEPP (Exempt and Complying Development Codes) 2008 - Greenfield Housing Code
This spatial dataset identifies the areas where the Greenfield Housing Code applies as designated by the relevant NSW environmental planning instrument (EPI) under the...